12 Larkspur Road, Flat 4B

PRT-09711 · UPRN 100022611743 · Manchester M14 · Compliance Officer: Sarah Whitmore

Register
Risk Rating: HighAwaab: Cat 1 — Damp & MouldOpen Cases: 3Outstanding Actions: 4Vulnerabilities: Asthma (child)Last Inspection: 01 Jun 2026

DampSurvey-Pro Investigation Evidence

Specialist damp, mould & timber investigation engine — feeding evidence into the compliance control centre

Integration · LiveReport Complete
DampSurvey-Pro· Specialist Investigation Platform

Hub raises the request → DampSurvey-Pro conducts the survey → evidence, hazards & recommendations return to Housing Compliance Hub.

Investigation Status
Linked case CMP-2841
  1. Requested
  2. Assigned
  3. In Progress
  4. Report Complete
  5. Actions Raised
Damp & Mould Specialist Investigation Report

DSP-INV-48211

Property
12 Larkspur Road, Flat 4B · Manchester M14 7QJ
Surveyor
Jaya Patel MCIOB · Sentinel Damp Specialists Ltd
Inspection date
01 Jun 2026
Report generated
02 Jun 2026 · 14:32
Risk rating
High
Moisture source
Combined: defective extractor fan + suspected external rainwater ingress
Rooms affected
Kitchen ceiling · Bathroom external wall · Bedroom 2 reveal
Photos attached
42 images
Awaab compliance
Cat 1
Social housing mode
Enabled · Awaab-aligned reporting
Hazards Identified
  • HHSRS Cat 1 — Damp & Mould Growth
  • Aspergillus colonisation on plasterboard
  • Cold bridging at concrete wall junction
Environmental Readings Summary
Kitchen RH
78% RH
Bathroom RH
84% RH
Bedroom RH
62% RH
Surface temp (wall)
11.4 °C
Protimeter (ceiling)
WME 28%
CO₂ avg
1,420 ppm
Recommendations Raised (6)
  1. 01Replace defective bathroom extractor fan (15 l/s continuous)
  2. 02Investigate external rainwater goods to flat above
  3. 03Specialist mould remediation — kitchen ceiling & bathroom wall
  4. 04Improve trickle ventilation provision to bedrooms
  5. 05Schedule 6-week follow-up moisture monitoring
  6. 06Issue resident with damp & mould advice pack

DampSurvey-Pro provides specialist damp, mould and timber investigation evidence. Housing Compliance Hub manages risk, deadlines, actions, evidence and compliance oversight — DampSurvey-Pro remains the investigation engine.

Open Cases

3 cases require attention

View all →
  • Damp ingress — kitchen ceiling
    CMP-2841 · SLA due 04 Jun
    HighIn Inspection
  • Mould growth — bathroom wall
    CMP-2840 · SLA due 03 Jun
    HighAwaiting Action
  • Window seal — bedroom 2
    CMP-2742 · SLA due 12 Jun
    MediumAwaiting Quote

Recent Surveys

  • Damp & Mould Inspection
    J. Patel · 01 Jun 2026
    Cat 1 confirmed
  • Asbestos Re-inspection
    Sentinel Surveys · 14 Mar 2026
    No change
  • Block FRA
    Firesafe UK · 08 Jan 2026
    Compliant

Outstanding Actions

  • Replace plasterboard
    Halton Property
    11 JunAwaiting
  • Issue dehumidifier
    Northern Maint.
    05 JunActive
  • Resident comms update
    S. Whitmore
    04 JunActive
  • Post-works sign-off
    S. Whitmore
    14 JunScheduled

Upcoming Inspections

  • Post-remedial damp inspection
    14 Jun · 10:30 · J. Patel
  • Annual Gas Safety
    22 Aug · 14:00 · Northern Gas
  • Block FRA review
    12 Jan 2027 · Firesafe UK

Hazards Identified

  • Damp & MouldCat 1
  • Excess Cold (winter risk)Cat 2
  • Window restrictorsCat 2

Contractor Assignments

  • Halton Property Services
    Damp & Plastering · 2 live actions
    Perf. A
  • Northern Maintenance Ltd
    Reactive Repairs · 1 live action
    Perf. A+
  • Northern Gas Solutions
    Heating & Gas · 0 live actions
    Perf. A

Property Compliance Timeline

Permanent audit record · all events immutable

  1. Complaint received

    28 May 2026

    Resident phone call · 09:14

  2. Triaged as Awaab Category 1

    28 May 2026 · 09:42

    S. Whitmore · Compliance Director

  3. Inspection booked

    29 May 2026

    Surveyor J. Patel · Slot 14:00

  4. Surveyor on site

    01 Jun 2026 · 13:58

    Arrival logged · GPS verified

  5. Inspection completed & report uploaded

    01 Jun 2026 · 15:20

    Cat 1 confirmed · damp ingress kitchen ceiling

  6. Actions raised — 4 items

    01 Jun 2026 · 16:05

    Plasterboard, dehumidifier, comms, sign-off

  7. Contractor assigned

    02 Jun 2026 · 08:30

    Halton Property Services · SLA 7 days

  8. Evidence uploaded

    02 Jun 2026 · 11:12

    14 photos · 2 reports · resident statement

  9. Awaiting works completion & sign-off

    Now

    Post-works inspection 14 Jun 2026