Flagship Case Journey

CMP-2841 · Ash Court · Awaab Cat 1 — Damp & Mould

Risk RatingHigh
AwaabCat 1 — Damp & Mould
VulnerabilityAsthma — child age 7
SLA Remaining3d 14h
Opened28 May 2026
ResidentAdetola Akintola · Tenant since 2019

End-to-End Compliance Journey

Every stage records timestamped activity, owner, evidence and outstanding actions

  1. Stage 01Complete

    Resident Complaint Received

    28 May 2026 · 09:14 · Resident Services · J. Lin

    2 evidence 1 action

    Inbound call logged via Resident Services. Black mould reported on kitchen ceiling. Vulnerability check ran automatically against the household record.

  2. Stage 02Complete

    Inspection Booked

    28 May 2026 · 09:42 · Compliance Officer · S. Whitmore

    1 evidence 1 action

    Case triaged as Awaab Category 1. 5-day statutory inspection booked with internal surveyor J. Patel. Resident notified by SMS.

  3. Stage 03Complete

    Damp Investigation Completed

    01 Jun 2026 · 11:20 · Surveyor · J. Patel

    12 evidence 3 actions

    On-site inspection conducted: moisture mapping, thermal imaging and cavity inspection. Cat 1 damp confirmed; root cause traced to failed external render.

  4. Stage 04Complete

    Vulnerable Occupant Identified

    01 Jun 2026 · 14:05 · Compliance Officer · S. Whitmore

    1 evidence 1 action

    Vulnerability re-confirmed via household assessment. Director of Compliance notified; case auto-escalated to executive watch list.

  5. Stage 05Active

    Actions Raised

    02 Jun 2026 · 08:30 · Compliance Officer · S. Whitmore

    0 evidence 4 actions

    4 actions raised: dehumidifier issue, plasterboard strip & replace, external render patch, post-works sign-off. Owners and SLAs assigned.

  6. Stage 06Active

    Contractor Assigned

    02 Jun 2026 · 16:11 · Procurement · M. Owusu

    1 evidence 0 actions

    Halton Property Services accepted plasterboard works. Quote £2,840 submitted; awaiting Director approval.

  7. Stage 07Active

    Evidence Uploaded

    Ongoing · Multiple contributors

    12 evidence 0 actions

    Inspection report, photography, moisture data and contractor documentation linked to case. 12 items captured to date.

  8. Stage 08Scheduled

    Follow-Up Inspection

    14 Jun 2026 · 10:30 · Surveyor · J. Patel

    0 evidence 1 action

    Post-remedial inspection scheduled. Required outcome: zero Cat 1 hazard signature, moisture < 18%.

  9. Stage 09Scheduled

    Case Closed

    Target: 18 Jun 2026 · Director · S. Whitmore

    0 evidence 1 action

    Director sign-off required. Resident satisfaction survey issued automatically. Case archived to Evidence Vault with immutable audit trail.

DampSurvey-Pro Investigation Evidence

Specialist damp, mould & timber investigation engine — feeding evidence into the compliance control centre

Integration · LiveReport Complete
DampSurvey-Pro· Specialist Investigation Platform

Hub raises the request → DampSurvey-Pro conducts the survey → evidence, hazards & recommendations return to Housing Compliance Hub.

Investigation Status
Linked case CMP-2841
  1. Requested
  2. Assigned
  3. In Progress
  4. Report Complete
  5. Actions Raised
Damp & Mould Specialist Investigation Report

DSP-INV-48211

Property
12 Larkspur Road, Flat 4B · Manchester M14 7QJ
Surveyor
Jaya Patel MCIOB · Sentinel Damp Specialists Ltd
Inspection date
01 Jun 2026
Report generated
02 Jun 2026 · 14:32
Risk rating
High
Moisture source
Combined: defective extractor fan + suspected external rainwater ingress
Rooms affected
Kitchen ceiling · Bathroom external wall · Bedroom 2 reveal
Photos attached
42 images
Awaab compliance
Cat 1
Social housing mode
Enabled · Awaab-aligned reporting
Hazards Identified
  • HHSRS Cat 1 — Damp & Mould Growth
  • Aspergillus colonisation on plasterboard
  • Cold bridging at concrete wall junction
Environmental Readings Summary
Kitchen RH
78% RH
Bathroom RH
84% RH
Bedroom RH
62% RH
Surface temp (wall)
11.4 °C
Protimeter (ceiling)
WME 28%
CO₂ avg
1,420 ppm
Recommendations Raised (6)
  1. 01Replace defective bathroom extractor fan (15 l/s continuous)
  2. 02Investigate external rainwater goods to flat above
  3. 03Specialist mould remediation — kitchen ceiling & bathroom wall
  4. 04Improve trickle ventilation provision to bedrooms
  5. 05Schedule 6-week follow-up moisture monitoring
  6. 06Issue resident with damp & mould advice pack

DampSurvey-Pro provides specialist damp, mould and timber investigation evidence. Housing Compliance Hub manages risk, deadlines, actions, evidence and compliance oversight — DampSurvey-Pro remains the investigation engine.

Property Compliance Story

Ash Court

Background
Ash Court received 11 resident complaints across 18 months relating to recurring black mould in kitchen and bathroom areas. Two households declared respiratory vulnerabilities, including an asthmatic child in Flat 4B.
Investigation
A block-wide damp investigation surveyed 100% of units within 21 days. Thermal imaging identified cold bridging across the north elevation; moisture readings exceeded 22% in 9 units.
Actions
27 individual actions raised — including external render repair, MVHR retrofit pilot in 4 units, and a coordinated decant programme for the highest risk flat.
Evidence
84 evidence items captured: inspection reports, contractor quotes, before/after photography, moisture data logs and resident communications, all timestamped against the audit trail.
Outcome
All Cat 1 hazards remediated within 38 days. Block compliance score improved from 61 → 72. Resident satisfaction in post-works survey: 89%.

Compliance Outcomes

  • 9-stage workflowTracked end-to-end
  • SLA3d 14h remaining
  • Evidence captured17 items linked
  • Actions raised12 across 4 stages
  • Director sign-offRequired at close
  • Awaab Cat 1Auto-escalated

Audit Trail Snapshot

Immutable record

  • 2026-05-28T09:14:02 · INTAKE · J.Lin
  • 2026-05-28T09:42:11 · TRIAGE · S.Whitmore
  • 2026-05-28T09:42:14 · ESCALATE · vulnerability
  • 2026-06-01T11:20:48 · INSPECTION · J.Patel
  • 2026-06-01T14:05:33 · ESCALATE · cat1
  • 2026-06-02T08:30:01 · ACTIONS_RAISED · 4
  • 2026-06-02T16:11:07 · CONTRACTOR · Halton
  • ... 14 entries · view in Evidence Vault